
Suspended Specialty Scaffold
This is a specialty project designed to hoist up 1500lb glass panels with a Beta Max hoist on a rail system.
Read MoreThis is a specialty project designed to hoist up 1500lb glass panels with a Beta Max hoist on a rail system.
Read MoreWe provided swing stages to access the sides of this building for renovation. Our challenge was to set up the roof rigging where our beam would reach over the large roof top AC units.
Read MoreWe installed scaffold swing stages for the installation of each sign for the college hospital as presented throughout the year.
Read MoreWe provided working scaffold deck levels for access to wet-well walls and slope. Our challenges were the confined space and mobilizing equipment through a small entry hole.
Read MoreWe provided scaffold swing stage access to work area, both east and west side of the building, the sign is approximately 60' on each side. One of the difficult challenges was that the hospital would not allow our technicians to bring any tool or equipment through the hospital.
Read MoreWe shored up the ceiling with scaffold so that construction crews could remove and replace the support beams.
Read MoreProvided Scaffold for plaster work.
Read MoreOur scaffold crew hung a swing stage so that the sign could be placed high on the 35 story, 441 foot tall Suntrust building.
Read MoreProvided scaffold so that construction crews could safely reach all sides of this portion of the hospital.
Read MoreWe provided a scaffold plywood trash chute for the renovation of the Iberia Bank. Plywood was used to provide a stronger structure for large debris.
Read More